Custom homes and whole-house remodels.
New houses on lots other firms walk away from, and full remodels of houses that have good bones and bad plans. Designed and built by the same nine people.
$900k to $3M build cost
14 to 22 months

Typical budgets
Real ranges, before the first meeting.
Build cost only. Land, furniture and landscaping beyond the house are separate. Your number gets tighter at every step.
- New hillside home
- $1.6M to $3M, for 2,800 to 4,500 sq ft
- Whole-house remodel
- $900k to $1.8M, depending on how much structure changes
- Design fee
- 10 to 14 percent of build cost, billed by step
- Timeline
- 14 to 22 months from first walk to keys
What is included
Everything from the survey to the last cabinet pull.
- Topographic survey, soils report and zoning study
- Two schematic options and a physical model
- Structural, civil and energy engineering, coordinated by us
- Hillside design review with the Town of Los Gatos
- Permit set and every plan check correction
- Construction by our crew and the trades we hire
- Built-in millwork from our Campbell shop
- Weekly photo reports and an open book on costs
Homes we have built
Two to start with.
Also from the studio

